Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 11 Current »

Content

VT-BAT Backup reservation battery 6F22 9V DC for monitoring system by Vutlan-04.jpgVT-BAT Backup reservation battery 6F22 9V DC for monitoring system by Vutlan-05.jpg
VT-BAT Backup reservation battery 6F22 9V DC for monitoring system by Vutlan-01.jpg

Function and purpose

The VT-BAT / Reservation Battery 9V is an essential backup solution for maintaining operational integrity in your Vutlan monitoring systems. This extension module ensures that your critical infrastructure remains functional during power outages or interruptions.

Key Features:

  • Emergency Backup Power: Designed for use in emergencies, the VT-BAT utilizes a non-rechargeable 6F22 9V lithium battery to provide reliable power when the main source is unavailable.

  • Extended Operation Time: Depending on the usage and load, the Vutlan monitoring system can operate on this battery for approximately 1 to 10 hours, giving you the peace of mind that essential monitoring functions will continue.

  • Compatibility: The VT-BAT is designed to work with the VT604t, VT825t, and VT855t models, ensuring seamless integration into your existing monitoring setup.

By incorporating the VT-BAT into your system, you can safeguard against potential downtime, making it an indispensable component for businesses that rely on continuous environmental monitoring and control.

6F22 9V lithium battery is not included..

You can use 9V battery enclosed in standard PP3 enclosure

  • 6F22 lithium

Recommended battery U9VL-JP

Physical Description

The PCB has no LEDs.

Installation

#

 

 

1

a) Unscrew x2 countersink screws at the panel named “Battery extension slot” located at the back of the monitoring system case.

b) take the panel out.

2

Insert the battery inside VT-ACCU PCB unit. 6F22 9V

DO NOT USE RECHARGEABLE BATTERY! Only use Non-rechargeable battery!

You can use 9V battery enclosed in standard PP3 enclosure

  • 6F22 (zinc-carbon batteries 400 mAh)

  • 6LR61 (alkaline batteries 565 mAh)

3

Push in the battery case with it’s legs into the PCB gaps.

4

Slide the battery case so that it locks into the PCB.

5

Screw the unit to the panel that we have unscrewed in step one using x2 screws M3.

6

a) Plug the assembly into the monitoring system slot named “Batttery extenion slot”.

b) Screw the panel to the enclosure using x2 countersink screws that we have received in step 1.

Package content

Make sure that the contents of the delivery meet the following configuration.

Report a missing or damaged component to your supplier.

If damage occurred during transportation, contact the appropriate delivery service.

Package content

Description

Quantity

1

PCB (batteries are no included)

x1

2

M3 screws

x2

3

Battery cover

x1


Copyright:

Vutlan s.r.o. (LLC)

Remote Infrastructure Monitoring and Control

43 ul.Svornosti, 821 06 Bratislava,

Slovak Republic

http://www.vutlan.com

  • No labels