Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Content

Table of Contents
stylenone
VT-BAT Backup reservation battery 6F22 9V DC for monitoring system by Vutlan-04.jpgImage AddedVT-BAT Backup reservation battery 6F22 9V DC for monitoring system by Vutlan-05.jpgImage Added
VT-BAT Backup reservation battery 6F22 9V DC for monitoring system by Vutlan-01.jpgImage Added

Function and purpose

VT-6F22 BAT / Reservation battery 9V is an extension module that can be purchased separately.

Keep your Vutlan monitoring systems operational with the VT-BAT 6F22 9V Backup Battery while the main power source is disabled. Designed for emergency use during power failures, this non-rechargeable battery provides dependable backup to safeguard your critical infrastructure when needed most.

The device uses a non-rechargeable 6F22 9V lithium battery. The Vutlan monitoring system may work from this battery for approximately 1 to 10 hours.

It is used for VT604t, VT825t, and VT855t.

Note

You can use 9V battery enclosed in standard PP3 enclosure

  • 6F22 lithium

Recommended battery U9VL-JP

Note

In development. Coming soon.

Physical Description

The PCB has no LEDs.

Installation

#

 

 

1

a) Unscrew x2 countersink screws at the panel named “Battery extension slot” located at the back of the monitoring system case.

b) take the panel out.

2

Insert the battery inside VT-ACCU PCB unit. 6F22 9V

Note

DO NOT USE RECHARGEABLE BATTERY! Only use Non-rechargeable battery!

Note

You can use 9V battery enclosed in standard PP3 enclosure

  • 6F22 (zinc-carbon batteries 400 mAh)

  • 6LR61 (alkaline batteries 565 mAh)

3

Push in the battery case with it’s legs into the PCB gaps.

4

Slide the battery case so that it locks into the PCB.

5

Screw the unit to the panel that we have unscrewed in step one using x2 screws M3.

6

a) Plug the assembly into the monitoring system slot named “Batttery extenion slot”.

b) Screw the panel to the enclosure using x2 countersink screws that we have received in step 1.

Package content

Include Page
VT-BAT package content
VT-BAT package content

...