...
The PCB has no LEDs.
Installation
# |
|
| ||||
---|---|---|---|---|---|---|
# |
|
| ||||
1 | a) Unscrew x2 countersink screws at the panel named “Battery extension slot” located at the back of the monitoring system case. b) take the panel out. | |||||
2 | Insert the battery inside VT-ACCU PCB unit. 6F22 9V
| |||||
3 | Push in the battery case with it’s legs into the PCB gaps. | |||||
4 | Slide the battery case so that it locks into the PCB. | |||||
5 | Screw the unit to the panel that we have unscrewed in step one using x2 screws M3. | |||||
6 | a) Plug the assembly into the monitoring system slot named “Batttery extenion slot”. b) Screw the panel to the enclosure using x2 countersink screws that we have received in step 1. |
Package content
Include Page | |||
---|---|---|---|
|
...
Copyright:
Vutlan s.r.o. (LLC)
...