Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Include Page
VT520 package content
VT520 package content

Drawings

View file
nameVT520 v4 AC voltage monitor DWGs.pdf
height250

Sensor installation

  1. Plug the sensor to any of the "A1...A8 analog ports" of the Vutlan monitoring system using a supplied "RJ11 6P4C to USB cable".
  2. Plug the sensor into the IEC14 socket.
  3. The sensor will be detected by the system automatically.

...